Identificador persistente para citar o vincular este elemento: http://hdl.handle.net/10662/19838
Títulos: Maintenance policy for a system with a weighted linear combination of degradation processes
Autores/as: Wu, Shaomin
Torres Castro, María Inmaculada
Palabras clave: proceso gamma;proceso geométrico;mantenimiento preventivo;mantenimiento basado en condiciones;restricciones de mantenimiento;gamma process;geometric process;preventive maintenance;maintenance constraints;condition-based maintenance
Fecha de publicación: 2019
Editor/a: Elsevier
Resumen: This paper develops maintenance policies for a system under condition monitoring. We assume that a number of defects may develop and the degradation process of each defect follows a gamma process. The system is said failed if a linear combination of the degradation processes exceeds a pre-specified threshold. Preventive maintenance is performed. The system is renewed after several preventive maintenance activities have been performed. The main objective of this paper is to optimise the time between preventive maintenance actions and the number of the preventive maintenance. Numerical examples are given to illustrate the results.
Descripción: Publicado en European Journal of Operational Research Volume 280, Issue 1, 1 January 2020, Pages 124-133, con DOI https://doi.org/10.1016/j.ejor.2019.06.048
URI: http://hdl.handle.net/10662/19838
DOI: 10.48550/arXiv.2401.12263
Colección:DMATE - Artículos

Archivos
Archivo Descripción TamañoFormato 
arXiv_2401_12263_preprint.pdf396,03 kBAdobe PDFDescargar


Este elemento está sujeto a una licencia Licencia Creative Commons Creative Commons