Title: | Estudio de implantación de una planta termosolar de colectores cilindro-parabólicos en la Campiña Sur |
Authors: | Fernández González, Jesús |
metadata.dc.contributor.advisor: | Ceballos Martínez, José María Quirós Rosado, Elia María |
Keywords: | Planta termosolar;Colectores cilindro-parabólicos;Campiña Sur (Badajoz);Solar power tower;Thermosolar plant;Parabolic-cylinder collectors |
Issue Date: | 2016-07-11 |
metadata.dc.date.submitted: | Jan-2016 |
Abstract: | El objeto del presente proyecto es ubicar la localización idónea para implantar una central termosolar de colectores cilindro-parabólicos en la comarca de la Campiña Sur (Badajoz), además de definir la mayor parte de las obras civiles relacionadas con su construcción, como son:
• El movimiento de tierras (Desbroce, desmonte y terraplén)
• La estructura de los colectores (Cimentaciones y estructura metálica)
• Las balsas de regulación
• La reposición de servicios
• Las actuaciones de integración ambiental
• El cerramiento de la central
Quedan fuera del ámbito de este proyecto actuaciones como la impulsión de agua hasta las balsas, los viales internos, la depuración de las aguas empleadas en el ciclo de funcionamiento, el drenaje, la remodelación de la carretera de acceso, etc., además de otras cuya definición correría a cargo de profesionales con otra titulación, como son las conducciones internas de la planta, la turbina, las torres de refrigeración, la subestación transformadora, etc. The object of this project is to locate the ideal location to deploy a solar-thermal power plant parabolic-cylinder collectors in the region of the countryside south (Badajoz), in addition to defining the greater part of the civil works related to its construction, as are: • The movement of land (clearing, disassemble and Embankment) • The structure of the manifolds (Foundations and metallic structure) • The rafts regulation • Refitting services • The actions of environmental integration • The enclosure of the central fall outside the scope of this project performances as the water drive until the rafts, internal vials, the purification of the water employed in the operating cycle, drainage, the remodeling of the road Access, etc., in addition to other whose definition would be in charge of professionals with other qualifications, as are the internal pipes of the plant, turbine, cooling towers, transformer substation, etc. |
URI: | http://hdl.handle.net/10662/4444 |
Appears in Collections: | Grado en Ingeniería Civil - Construcciones Civiles |